Series Pro Roostevaba 125mm
Fillable, Removable Floor Hatch Series Pro Roostevaba 125mm
Hatch is made of 2 mm stainless steel. The hatch frame is equipped with special circumferential frost and weather-resistant gasket, which is waterproof and largely odor-resistant. The hatch is laid into a prepared recess in the floor, the upper edge of the hatch cover is leveled flush with the level of the future finished floor covering. The hatch cover and the perimeter around the hatch are filled with concrete either completely or up to the lower edge of the future finished floor covering. After the solution has fully hardened, the finished floor covering is laid in the tray and around the entire perimeter.
Opening is carried out by screwing lifting keys into special holes in the corners of the hatch cover. Hatch lid is removable.
400 kN (class D400), which is up to 40 tons/square meter.
Lifting keys are included in the set.
Custom dimensions are available upon request. Minimal dimensions 400 х 400 mm. Maximum dimensions 1000 х 1000 mm.
For more information, feel free to contact: info@luugid.ee or tel. +372 5801 2000.
| Hatch material | Stainless steel 2mm |
| Hatch cover type | Fillable |
| Tray depth | 100 mm |
| Installation height | 125 mm |
| Max load | 400 kN (class D400), which is up to 40 tons/square meter. |
| Opening type | With lifting key |
| Opening | Only from outside |
|
Finishing material options.
|
Tiles, concrete, synthetic resin, granite, wood, and other hard floor coverings. |
When installing the hatch, you need to ensure at least 130 mm of free space around the perimeter of the hatch frame for concrete pouring.
| Dimensions | 1200 × 1330 cm |
|---|

Installation Instruction for floor hatch Series Zn/Roostevaba
- Check the completeness of the delivery (4 lifting keys, screws + caps, reinforcement grid each).
- For covers made of stainless steel or galvanized steel, bend the wall anchors to ensure reliable anchoring in
the concrete later. - Remove the caps and screws, open the cover with the lifting keys, and take the tray out of the outer frame.
- Place the manhole cover in the recess on the floor and align it flush with the height of the finished floor
covering. There should be at least 130 mm space all around for concreting. - Close the cover and fasten the screws and caps. Check the correct position of the manhole cover again.
- Place the reinforcement grid in the tray, fill the tray completely or up to the lower edge of the finished
floor covering, and completely concrete the manhole cover all around or up to the lower edge of the
finished floor covering. Ensure that the reinforcement grid is completely encased in concrete and protect
the screws and edges from concrete splashes. - Allow the concrete to fully harden. Once the frame has a firm connection with the concrete, the manhole
cover can no longer slip. - Once the concrete has reached approximately 80% of its strength, clean the visible surfaces of the manhole
cover. - After complete hardening, finish the final floor covering in the tray and all around. Clean the remaining
part of the manhole cover, close it, and fasten the screws and caps.